Project Overview
Hazelwood Mine – Earthworks and Labour
Project Status: Completed
Hazelwood Mine – Earthworks and Labour
Client: Engie
Contract Type: Cost Plus
Value: $650,000,000.00
110
Permanent local jobs created.
210,000
Man hours
3,000,000m3+
Earth moved annually
20+
Years of repeat work
Project Challenge
RTL’s team to load and haul high quality organic materials from the pit to the final location. RTL’s team also maintained and developed localised mining infrastructure within the mine foot print.
RTL's Approach
RTL delivered this Project annually with its ongoing relationship with Engine at Hazelwood Mine with its permanent fleet of excavators, dozers and haul trucks that were ideal for this bespoke Project.
Project Outcomes
1. RTL works included the civil component required for this Project which was not limited to earthworks, concrete and drainage at Hazelwood Mine which made RTL the contractor of choice for these works.
2. RTL is able to work with the ongoing Mine Operations and other site sub-contractors to complete these works.